Home
Buttonwood Heights
Services
  • New Home Builder
  • Home Additions
  • Roof Replacement
  • Roof Repair
  • Siding Replacement
  • Siding Repair
  • Window Replacement
  • Door Replacement
  • Decks
  • Patios
  • Flooring
About Reimer Homes
  • Reimer Homes Gallery
  • Meet the Team
  • Prefered Lenders
  • Testimonials
Contact
Home
Buttonwood Heights
Services
  • New Home Builder
  • Home Additions
  • Roof Replacement
  • Roof Repair
  • Siding Replacement
  • Siding Repair
  • Window Replacement
  • Door Replacement
  • Decks
  • Patios
  • Flooring
About Reimer Homes
  • Reimer Homes Gallery
  • Meet the Team
  • Prefered Lenders
  • Testimonials
Contact
More
  • Home
  • Buttonwood Heights
  • Services
    • New Home Builder
    • Home Additions
    • Roof Replacement
    • Roof Repair
    • Siding Replacement
    • Siding Repair
    • Window Replacement
    • Door Replacement
    • Decks
    • Patios
    • Flooring
  • About Reimer Homes
    • Reimer Homes Gallery
    • Meet the Team
    • Prefered Lenders
    • Testimonials
  • Contact
  • Home
  • Buttonwood Heights
  • Services
    • New Home Builder
    • Home Additions
    • Roof Replacement
    • Roof Repair
    • Siding Replacement
    • Siding Repair
    • Window Replacement
    • Door Replacement
    • Decks
    • Patios
    • Flooring
  • About Reimer Homes
    • Reimer Homes Gallery
    • Meet the Team
    • Prefered Lenders
    • Testimonials
  • Contact

Siding Replacement in Rochester, NY

 Loose panels, widespread deterioration, failing trim, or recurring exterior problems can make complete siding replacement more practical than a series of isolated siding repairs. Reimer Homes brings the construction knowledge of experienced framers and home builders to the project, considering how the new siding will meet windows, doors, rooflines, trim, and the wall assembly behind it.

Before installation begins, we review the existing exterior, visible flashing and trim conditions, wall openings, roof intersections, and areas where water collects or changes direction. Removing the old siding may also expose concealed conditions that need to be addressed before the replacement materials are installed.

Careful detailing at corners, openings, edges, and transitions helps the new siding and trim create a consistent finished exterior while supporting the flashing and water-management details behind them.

Modern black house with a large driveway and garage.

Plan Your Siding Replacement Across the Whole Exterior

 

The amount of siding on a home is only one part of defining a replacement project. Each side may have a different arrangement of windows, doors, corners, utility penetrations, rooflines, decks, foundation transitions, and areas changed by previous additions or renovations.

Reimer Homes documents these differences before the scope is established. The size and shape of each wall, the number of openings, access around the property, and the way siding meets adjoining materials all influence material quantities, installation details, and the order in which the work should proceed.

On some homes, much of the existing trim arrangement may remain in place. Other projects may call for revised flashing, new trim details, adjustments around windows and doors, or preparation where removing the old siding exposes damaged or uneven wall surfaces.

Planning these conditions across the entire exterior helps maintain consistent details at corners, openings, rooflines, and transitions rather than treating each wall as an isolated installation.

Schedule a Consultation

What to Expect During Your Siding Replacement

Complete siding replacement involves more than removing old materials and installing a new exterior covering. The project must account for the wall surfaces behind the siding, weather-resistive barriers, windows and doors, trim, utility penetrations, adjoining materials, property access, and the details required at corners and transitions 

1. Initial Conversation

 We begin by discussing the condition of the existing siding, the problems you have noticed, previous exterior work, and the reasons you are considering replacement. We also review your material preferences, project priorities, preferred timing, and any areas of the home that may require particular attention. 

2. Exterior and Property Evaluation

Reimer Homes reviews each side of the home, documenting the existing siding, wall dimensions, windows, doors, corners, utility penetrations, roof intersections, decks, foundation transitions, and areas affected by additions or previous renovations.

We also consider landscaping, driveways, access around the property, material-staging locations, and other conditions that may influence delivery, equipment placement, removal, and installation.

3. Replacement Scope and Proposal

5. Existing Siding Removal and Wall Review

3. Replacement Scope and Proposal

 

After the evaluation, we define the planned work and prepare a proposal based on the home’s exterior configuration and visible conditions. The scope identifies the siding removal, wall preparation, weather-barrier and flashing details, replacement materials, trim work, exterior transitions, and cleanup included in the project.

Some wall surfaces, flashing details, and previous construction remain concealed until the existing siding is removed. Project planning also establishes how hidden conditions and any related changes will be communicated and addressed if they are discovered.

4. Preconstruction Preparation

5. Existing Siding Removal and Wall Review

3. Replacement Scope and Proposal

 

Before work begins, Reimer Homes coordinates material delivery, property access, equipment placement, disposal needs, permit requirements, and the sequence in which the exterior will be completed.

Homeowners are informed about access routes, material placement, construction noise, temporary limitations around the property, and other preparations that may affect the household.

5. Existing Siding Removal and Wall Review

5. Existing Siding Removal and Wall Review

6. Weather Barrier, Flashing, and Opening Preparation

 The siding materials included in the project scope are removed in an organized sequence. This exposes visible portions of the wall surface, sheathing, weather barrier, flashing, trim connections, and adjoining materials.

The exposed wall must provide an appropriate surface for the replacement system. Damaged sheathing, uneven areas, previous modifications, or other conditions may need attention before installation continues. When a concealed condition affects the established scope, Reimer Homes explains what was found and discusses the required next step before changed work proceeds.

6. Weather Barrier, Flashing, and Opening Preparation

6. Weather Barrier, Flashing, and Opening Preparation

6. Weather Barrier, Flashing, and Opening Preparation

 Weather-resistive barrier materials help manage water that reaches the area behind the siding. Depending on the existing construction and project scope, these materials may be installed or integrated across wall surfaces and around openings, penetrations, and transitions.

Windows and doors receive particular attention where siding, trim, flashing, and the surrounding wall assembly meet. These details are prepared before the new siding and trim are installed around the openings.

7. Siding, Trim, and Exterior Detail Installation

6. Weather Barrier, Flashing, and Opening Preparation

7. Siding, Trim, and Exterior Detail Installation

 The selected siding is installed according to the wall layout, product requirements, and established project scope. Installation accounts for alignment, fastening, clearances, material movement, and the connection between the siding and the layers behind it.

Corners, window and door trim, rooflines, foundation transitions, and changes between exterior materials receive defined finishing details. Mounting blocks, flashing, clearances, and trim are also incorporated around utility lines, vents, lights, outlets, hose connections, and other exterior fixtures.

Additions, porches, decks, intersecting rooflines, and previously renovated areas may introduce changes in wall depth, material type, or construction detail. These areas are integrated into the replacement using the preparation, flashing, and trim details required by the existing construction.

8. Cleanup and Final Review

6. Weather Barrier, Flashing, and Opening Preparation

7. Siding, Trim, and Exterior Detail Installation

 As installation is completed, removed siding, packaging, fasteners, project equipment, and other construction debris are cleared from the work areas.

Reimer Homes reviews the completed exterior and remaining site conditions with the homeowner. Outstanding project details are addressed before the siding-replacement work is closed out..

Frequently Asked Questions About Siding Replacement

Cost is influenced by the size and shape of the home, the selected siding, accessibility, trim requirements, and the number of windows, doors, rooflines, and exterior transitions involved. Preparation needs discovered after removal—including damaged sheathing, uneven wall surfaces, flashing changes, or weather-barrier work—may also affect the final scope. Reimer Homes evaluates the exterior before preparing a project-specific proposal. 


 A focused siding repair may be appropriate when damage is limited to a defined area and compatible materials can be integrated with the surrounding exterior. Complete replacement may be the better direction when deterioration affects several sides of the home, materials are repeatedly coming loose, repairs have become recurring, or matching the existing siding is no longer practical. 


 Some conditions cannot be confirmed until the existing siding is removed. If damaged sheathing, uneven surfaces, previous modifications, or another concealed concern affects the planned installation, Reimer Homes explains what was found and how the scope may need to change before additional work proceeds. 


 In some cases, coordinating window or door replacement with siding work can make sense because the surrounding wall and flashing details are already accessible. The decision depends on the condition of the existing units, project priorities, product lead times, and how the openings must connect with the new siding and trim.


In some cases, coordinating window or door replacement with siding work can make sense because the surrounding wall and flashing details are already accessible. The decision depends on the condition of the existing units, project priorities, product lead times, and how the openings must connect with the new siding and trim.


 Homeowners can often remain in the home during siding replacement, although the work creates noise and activity around the exterior. Expect deliveries, workers near windows and doors, debris removal, and temporary limitations around driveways, walkways, decks, or designated work areas. Reimer Homes explains the necessary property preparations before construction begins. 


Schedule a Siding Replacement Quote

Get Quote

Reimer Homes

7 South Ave Hilton NY 14468

(585) 721-6479

Copyright © 2026 Reimer Homes - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept